Microsoft Fabricarticles and guides
Microsoft Fabric explained for enterprise teams: capacity sizing, Fabric apps, real-time analytics and how Fabric fits alongside Power BI.
Power Apps vs Fabric Apps: A Rebuild-or-Stay Decision Rule
Decide which Power Apps to keep, which to rebuild as Fabric Apps and which to run alongside, using offline, ALM, licensing and preview checks.
Fabric Apps External Users: Client Portal Security Rules
Decide if a Fabric App can serve clients, partners or citizens: what guest and anonymous access allow, where RLS holds, and the UAE and Saudi gaps.
Build a Fabric App with Claude Code: A Hands-On Walkthrough
Take a Power BI semantic model to a deployed Fabric App with Claude Code: the rayfin commands, connector code, RLS tests and the errors that block deploys.
Fabric Apps Pricing: What Pro Covers and What Uses Capacity
Fabric Apps pricing, worked out: a 40-user app needs F4, not F2, because the SQL database floor alone uses 87% of an F2. UAE North rates included.
Real-Time Data in Fabric Apps: Refresh Limits and Latency Budget
Fabric Apps that query a semantic model depend on an API capped at 120 queries per minute per user. Refresh floors, a latency budget, and the faster path.
Power BI or a Custom App? One Rule for Where a Feature Lives
When to use Power BI vs a custom application: one rule, ten worked examples, and why write-back going GA moves the line less than most teams assume.
Fabric Apps vs a Custom Web App: What Each Can Actually Run
Fabric Apps vs a custom web app: what each can host, where Fabric Apps stops, and the preview, region and licensing limits to check first.
Which Microsoft Fabric Capacity Do You Need? F2 to F64 Sizing
Size Microsoft Fabric F-SKUs from F2 to F64+: the free-viewer licensing cliff, a worked cost comparison, and a right-sizing method that avoids overspend.
Power BI Premium to Fabric: A Migration Checklist and Timeline
P-SKU retirement is underway. Migrate Power BI Premium to Microsoft Fabric F-SKUs with a step-by-step checklist, deadline guide and gotcha list.
Microsoft Fabric vs Power BI: A Decision Framework for Buyers
Power BI is a workload inside Fabric, not a competitor. Use the F64 threshold and crossover math to decide between per-user licensing and Fabric capacity.
Is Power BI Part of Microsoft Fabric? A Plain-English Answer
Power BI is a core workload inside Microsoft Fabric, not a separate product being replaced. Here's what that means for your licenses and reports.
Qlik Sense vs Power BI: Licensing Costs Compared for Growing Teams
Qlik's capacity-based pricing vs Power BI Pro, PPU, and Fabric: verified list prices, cost scenarios at 50, 250, and 1,000 users, and the M365 E5 math.
Microsoft Fabric Apps and Rayfin: What the New App Layer Does
Learn which of the four Fabric app capabilities fits your scenario: new Fabric Apps preview, Rayfin SDK, translytical task flows, or Power Apps on OneLake.
Snapshot Tables in Microsoft Fabric from Semantic Models
How to materialize point-in-time snapshots from a Power BI semantic model into a Fabric lakehouse using notebooks, semantic-link, and scheduled pipelines.
Snowflake and Power BI: DirectQuery, Import or Fabric
Choose between DirectQuery, Import, and Fabric mirroring when connecting Snowflake to Power BI. Covers warehouse sizing, query pushdown, and cost.
Microsoft Fabric Adoption: Enterprise Roadmap for UAE & Saudi
Roadmap for Microsoft Fabric enterprise adoption: P-SKU migration, OneLake setup, medallion architecture, capacity planning, and UAE/Saudi rollout.
Microsoft Fabric Real-Time Analytics: Eventstream, KQL & Dashboards
Build real-time analytics in Microsoft Fabric: Eventstream ingestion, KQL databases, Real-Time hub, and live Power BI dashboards for UAE & Saudi teams.
Power BI Licensing Cost Optimization: Right-Size Your Spend
Right-size Power BI licensing costs: role-based audits, capacity scheduling, reserved pricing, and hybrid Pro/PPU/Fabric strategies that save 30%+.
Power BI Copilot Readiness: Semantic Model Prep Checklist
Prepare your Power BI environment for Copilot: semantic model optimization, RLS, licensing requirements, and an 8-week readiness checklist.
