Tableau to Power BI migration in Saudi Arabia
العربيةTableau to Power BI Migration Partner in Saudi Arabia
Move your Saudi organisation off Tableau with matching numbers, Arabic reports and a trained team.
We inventory your Tableau estate, rebuild what is still used in Power BI, run both side by side until the numbers match, and retrain your people. Cutover happens only when your report owners sign off.
- Saudi Arabiaالسعودية
- Dubai AI Campus, DIFC
- 1 hour time difference, the same across the Kingdom
- 2 to 3 hours by air, depending on the city
We serve the Kingdom from our Dubai office in DIFC, with no Saudi entity, and we work with Saudi teams on the Monday to Thursday overlap of the two working weeks.
Saudi Arabia at a glance
Saudi Arabia
24.71° N, 46.68° E
- of parallel running before cutover
- Up to 90 days
- clients across the GCC and Europe
- 25
- of them government entities
- 12
- time difference with the whole Kingdom
- 1 hour
When a dashboard is not enough, build a Fabric App
Fabric Apps let us build the internal tools that sit beside your reports: approvals, forecast overrides, data entry and reference-data editors. They run on the same Fabric data and the same security as your Power BI reports, so there is no separate stack to host, secure and pay for. We already have Fabric Apps running in UAE North.
Saudi Arabia
No Fabric region yet
UAE North
Dubai
- Fabric capacity region
- Saudi Arabia, no Fabric region yet
Microsoft has announced a Saudi Arabia East region in the Eastern Province for November 2026, but it is not yet listed for Fabric. Until it is, Fabric capacity for Saudi organisations sits in UAE North, and we agree upfront which data stays on your own servers.
- 01
One item, not four services
A database, an API, Entra sign-in and hosting come as one Fabric item, with no embed tokens.
- 02
Your security carries over
Every query runs as the signed-in user, so the row-level security in your semantic model applies inside the app.
- 03
Days, not months
From a Power BI semantic model to a working app in days, instead of weeks of custom integration.
- 04
Straight about the limits
Fabric Apps suit internal tools. Citizen-facing portals and always-on systems still need a custom build, and we say so up front.
Local context
What a Tableau exit involves for a Saudi organisation
01Licence cost is usually what starts the conversation. Tableau charges per user by role, and renewals tend to rise as reader numbers grow. Many Saudi organisations already own Microsoft 365 E5, which includes Power BI Pro, so the saving can be large. We build the cost comparison from your actual contract and users, not from list prices.
02Arabic and Hijri requirements are where Tableau reports often fall short. Many were built in English with the Gregorian calendar only. When we rebuild, we add right-to-left pages, Arabic captions, Arabic number formats and a Hijri date table to the model. The migrated report is then easier for an Arabic reader to use than the original, which helps adoption among executives.
03Parallel validation protects trust. For each migrated report, the old and new versions run together for an agreed period, and finance owners compare the totals. Retraining follows, because analysts move from Tableau calculations to DAX. We run sessions on your own reports, using the model your team will actually maintain, so the skills stay in the building after we leave.
Sample report
What your leadership sees, in Arabic and English
A sample report with illustrative figures. Switch to عربي to see the right-to-left version with Hijri dates.
شريك للانتقال من Tableau إلى Power BI في السعودية
ننقلكم من Tableau وفق خطة: حصر المحتوى، ومقارنة تكلفة التراخيص، والتحقق المتوازي، وإعادة التدريب، ثم الانتقال النهائي في الموعد الذي تحددونه.
Key indicators
Regulation
Built around Saudi Arabia's data rules
Personal Data Protection Law (PDPL)
Enforceable since 14 September 2024, with a separate regulation on transferring personal data outside the Kingdom that we design around.
NCA Essential and Cloud Cybersecurity Controls
ECC-2:2024 and CCC-2:2024 set the security baseline for cloud services, and our builds follow your organisation's compliance status against them.
NDMO data management standards
Binding on public bodies and their business partners, and a useful benchmark for private groups that sell to them.
A general summary, not legal advice.
Focus areas
Where Saudi Arabia teams start
- 01
Inventory and retirement list
Which workbooks are used, which are duplicates, and which can be switched off.
- 02
Licence cost comparison
Your Tableau contract set against Power BI licensing for the same users.
- 03
Arabic and Hijri rebuild
Right-to-left pages, Arabic formats and Hijri dates in every migrated report.
- 04
Analyst retraining on your reports
Hands-on sessions that move your team from Tableau calculations to DAX.
Clients
Trusted by giga-project bodies and enterprises in the Kingdom
In the Kingdom

Aramco Digital
Energy and digital, Eastern Province

Royal Commission for Al-Ula
Giga-project authority, AlUla

SIRC
Government-owned company, Saudi Arabia
Across the GCC and Europe
Beyond The Analytics successfully migrated our organization wide Tableau reporting infrastructure to Power BI with a strong focus on continuity, data integrity, and user confidence throughout the process. The team was professional, structured, and technically strong, making the transition seamless and leaving us with a scalable analytics environment.
Arun RodriguesModern Applications Manager, Al-BaharEngagement
What the work covers
What we do
- Workbook inventory and retirement of unused content
- Licence cost comparison before you commit
- Rebuild of dashboards and Tableau calculations in DAX
- Parallel validation against Tableau figures
- Role-based training for consumers and analysts
- Decommissioning plan for Tableau Server
What you receive
- A workbook inventory with keep, merge and retire decisions
- A licence cost comparison for both platforms
- A validation log showing each figure matched
- A cutover and decommissioning checklist
Stack
- Power BI
- Tableau Server
- Tableau REST API
- DAX
- Power Query
- Microsoft Fabric
Process
Four steps from first audit to handover
- 1
Inventory
We catalogue every workbook and its usage. Unused and duplicate content is retired before any rebuild starts.
- 2
Rebuild
Kept dashboards are rebuilt on a clean Power BI model, with Tableau calculations rewritten in DAX.
- 3
Parallel run
Both platforms run side by side while users and finance check that the figures agree.
- 4
Cut over
Users are trained by role, access moves across, and Tableau is switched off when you decide.
From the blog
Further reading
For leaders weighing the cost, risk and payoff of their reporting.
- Power BIRead the article
Tableau vs Power BI: Real Total Cost of Ownership
3-year TCO comparison of Tableau vs Power BI for UAE & Saudi enterprises: licensing, infrastructure, training, consulting, and hidden costs.
- Power BIRead the article
Tableau to Power BI Migration: UAE & Saudi Enterprise Playbook
Migrate Tableau to Power BI: current pricing, calc-field-to-DAX translation, UAE data residency, and realistic 12-week enterprise timelines.
- Power BIRead the article
500-Seat Tableau to Power BI Migration: $200K/Year Savings
How a 500-user UAE enterprise cut BI costs from $380K to $84K/year by migrating from Tableau Server to Power BI Pro: timeline and outcomes.
- Power BIRead the article
BI Migration Mistakes That Blow Budgets and Timelines
The ten mistakes that blow BI migration budgets (1:1 report rebuilds, skipped parallel runs, wrong Fabric SKU sizing) and what to do instead on each.
Questions
Asked by teams in Saudi Arabia
Anything not covered here, we can answer on a short call.
More locations






